Search
  • Logic Renovations

THE BIG REVEAL - Bathroom renovation for special needs child Part 2

In our previous article https://www.logicrenovations.com/post/bathroom-renovation-for-special-needs-child Vern discussed many issues with an upcoming bathroom renovation.

Upon initial inspection Vern found several areas in need of repair:

- The shower area was not keeping the water contained and it was leaking onto the remaining bathroom floor.

- The Glass door was not installed properly, it was far to low and he had to bend down just to get in and out, additionally the doors swayed.

- The flooring was created in an elevated way with several dips and bends that made it difficult for the family to move the commode.

- Tile work was done sloppily


Vern and his team has completed this project and we are happy to show you the result! Check out this video to see the completed project.





The client Aqeel Siddiqui said "I am so satisfied with this bathroom, Vern and he's team has done one amazing job coming into our home after this was done previously by another contractor that caused allot of issues. We are so greatful for everyone helping us out"


17 views
  • w-facebook
  • White Google+ Icon